Demolition is the tearing-down of buildings and other manmade structures. Demolition contrasts with deconstruction, which involves taking a building apart while carefully preserving valuable elements for reuse purposes.

For small buildings, such as houses, that are only two or three stories high, demolition is a rather simple process. The building is pulled down either manually or mechanically using large hydraulic equipment: elevated work platforms, cranes, excavators or bulldozers.

Larger buildings may require the use of a wrecking ball, a heavy weight on a cable that is swung by a crane into the side of the buildings. Wrecking balls are especially effective against masonry, but are less easily controlled and often less efficient than other methods.

Newer methods may use rotational hydraulic shears and silenced rock-breakers attached to excavators to cut or break through wood, steel, and concrete. The use of shears is especially common when flame cutting would be dangerous.

The tallest planned demolition of a building was the 47-story Singer Building in New York City, which was built in 1908 and torn down in 1967–1968 to be replaced by One Liberty Plaza.

Before any demolition activities can take place, there are many steps that must be carried out beforehand, including performing asbestos abatement, removing hazardous or regulated materials, obtaining necessary permits, submitting necessary notifications, disconnecting utilities, rodent baiting and the development of site-specific safety and work plans.

The typical razing of a building is accomplished as follows:

Hydraulic excavators may be used to topple one- or two-story buildings by an undermining process. The strategy is to undermine the building while controlling the manner and direction in which it falls.

The demolition project manager and supervisor will determine where undermining is necessary so that a building is pulled in the desired manner and direction. The walls are typically undermined at a building’s base, but this is not always the case if the building design dictates otherwise.

Safety and cleanup considerations are also taken into account in determining how the building is undermined and ultimately Demolition division in Miami and Fort Lauderdale in Florida. In some cases, a crane with a wrecking ball is used to Demolition division in Miami and Fort Lauderdale in Florida the structure down to a certainly manageable height. Demolition Division Miami Fort Lauderdale Florida

At that point, undermining takes place as described above. However, crane mounted demolition balls are rarely used within demolition due to the uncontrollable nature of the swinging ball and the safety implications associated.

High reach demolition excavators are more often used for tall buildings where explosive demolition is not appropriate or possible. Excavators with shear attachments are typically used to dismantle steel structural elements. Demolition Division Miami Fort Lauderdale Florida

Hydraulic hammers are often used for concrete structures and concrete processing attachments are used to crush concrete to a manageable size and to remove reinforcing steel.

For tall concrete buildings, where neither explosive or high reach demolition with an excavator is safe or practical, the “inside-out” method is used, whereby remotely operated mini-excavators Demolition division in Miami and Fort Lauderdale in Florida the building from the inside, whilst maintaining the outer walls of the building as a scaffolding, as each floor is Demolition division in Miami and Fort Lauderdale in Florida. Demolition Division Miami Fort Lauderdale Florida

To control dust, fire hoses are used to maintain a wet demolition. Hoses may be held by workers, secured in a fixed location, or attached to lifts to gain elevation.

Loaders or bulldozers may also be used to Demolition division in Miami and Fort Lauderdale in Florida a building. They are typically equipped with “rakes” (thick pieces of steel that could be an I-beam or tube) that are used to ram building walls. Skid loaders and loaders will also be used to take materials out and sort steel.

Demolition Division Miami Fort Lauderdale Florida

Demolition Division Miami Fort Lauderdale Florida

The technique of Vérinage is used in France to weaken and buckle the supports of central floors promoting the collapse of the top part of a building onto the bottom resulting in a rapid, symmetrical, collapse.

The Japanese companies have developed a new method of Demolition division in Miami and Fort Lauderdale in Florida and buildings which involve using computer-controlled hydraulic jacks to support the bottom floor as the supporting columns are removed.

The floor is lowered and this process is repeated for each floor. This technique is safer and more environmentally friendly and is useful in areas of high population density.

To Demolition division in Miami and Fort Lauderdale in Florida bridges, hoe rams are typically used to remove the concrete road deck and piers, while hydraulic shears are used to remove the bridge’s structural steel.

Allied Demolition and division in Miami and Fort Lauderdale in Florida is a premier Demolition and division services company utilizing recognized industry personnel and resources to deliver the service you expect and solutions you need to remove and recover your capital assets while ensuring a safe, effective, and comprehensive project. Demolition Division Miami Fort Lauderdale Florida

Allied Demolition and division in Miami and Fort Lauderdale in Florida provides these services worldwide and can market, sell, dismantle, Demolition division in Miami and Fort Lauderdale in Florida, or remediate any industrial site.

Allied Demolition and division in Miami and Fort Lauderdale in Florida often pays the demolition and division client for valuable scrap metal recovered from the site. Allied Demolition and division in Miami and Fort Lauderdale in Florida can Demolition division in Miami and Fort Lauderdale in Florida entire plants, units, tanks and/or individual pieces of equipment worldwide.

Allied Demolition and division in Miami and Fort Lauderdale in Florida provides expert service for Investment recovery, plant relocation, removal for resale, or demolition and division for scrap. Allied Demolition and division in Miami and Fort Lauderdale in Florida uses some of the latest equipment in the industry and constantly evaluates new technologies which enable us to finish projects on time and on a budget. Demolition Division Miami Fort Lauderdale Florida

With our Investment Recovery Team Allied Demolition and division in Miami and Fort Lauderdale in Florida can maximize the value of surplus equipment, machinery, valves or just obsolete equipment whether a single item or a whole unit Allied Demolition and division in Miami and Fort Lauderdale in Florida has buyers worldwide.

With Allied Demolition and division in Miami and Fort Lauderdale in Florida extensive network of buyer’s top dollar is brought in for equipment and scrap. Allied Demolition and division in Miami and Fort Lauderdale in Florida handles all aspects from dismantling to shipping to logistics’ for a truly worry-free project.

Allied Demolition and division in Miami and Fort Lauderdale in Florida is committed to customer satisfaction through understanding our customers’ needs, informed decision making and continually improving.

Process Unit & Storage Tank Demolition and division

Plant / Process Equipment

Dismantlement / Relocation

Disaster Relief

Site Remediation

Our Demolition division in Miami and Fort Lauderdale in Florida offers various applications of Demolition division in Miami and Fort Lauderdale in Florida for residential, commercial, and industrial projects. Capabilities include interior selective demolition division in Miami and Fort Lauderdale in Florida, driveway, sidewalk, and patio demolition division in Miami and Fort Lauderdale in Florida, and full structure Demolition Division Miami Fort Lauderdale Florida

We have numerous pieces of specialty demolition division in Miami and Fort Lauderdale in Florida equipment including a Brook, which is lightweight and compact enough to fit through doorways and elevators and is run by remote control so it can be used inside and out.

Hand Demolition division in Miami and Fort Lauderdale in Florida is not a quick method because only hand tools are used. However, cranes and shear legs may be used to hold or lower beams during cutting. Chutes or crane-and-skip are usually used to get debris safely from the upper stories to the ground.

Safe access must be provided. If work cannot be carried out safely on the building, a scaffold or machine-lifted platform should be used.

Demolition division in Miami and Fort Lauderdale in Florida only one storey at a time. It is usually safest to Demolition division in Miami and Fort Lauderdale in Florida the building in the reverse order to building it, so the roof should go first. Next, part of each floor is taken out so that the debris can fall through. On some jobs, the debris can be dropped down the lift shaft, in which case, guardrails must be provided around openings – refer to section 5.6.3 of this guideline.

Debris must be removed regularly and not allowed to pile up on floors. An overloaded floor could collapse onto the floor below, which in turn, could collapse on the floor below it. Without propping from the floors, the walls of the building could collapse. Walls could also collapse if debris is piled against them. Demolition Division Miami Fort Lauderdale Florida

If people have to work in a place with a fall risk without guardrails or barriers to isolate them from a fall, other protective measures must be implemented, including wearing a properly anchored safety harness. Harnesses are only to be implemented if all other controls cannot be used.

The employer shall need to undertake a hazard assessment to effectively determine the appropriate controls beforehand. All persons using any fall arrest systems must be fully trained in the correct and safe use of this equipment.

At the end of each day, make sure the building is safe. Guying or propping may be necessary to avoid hazards from wind or vibration. If only part of the building is knocked down, make sure that what is left can stand safety; demolition division in Miami and Fort Lauderdale in Florida with the ball. Most structures can be Demolition division in Miami and Fort Lauderdale in Florida by balling, but it is a skilled practice that cannot be self-taught.

Balling is a viable and effective method of Demolition division in Miami and Fort Lauderdale in Florida when Demolition division in Miami and Fort Lauderdale in Florida multi-storey structures that have suffered structural damage, where all other methods have been considered, and a hazard assessment has determined that this method is the most appropriate.

Hazards associated with this Demolition division in Miami and Fort Lauderdale in Florida method includes, but is not limited to:

  • Noise
  • Dust
  • Vibration to adjoining structures and buildings
  • Flying debris
  • Uncontrolled unintentional collapse
  • Limited waste minimization

Trainees must be instructed by trained and experienced people, and work under close supervision until they are competent.

Balling is hard on the machine: not all cranes can swing and control a Demolition division in Miami and Fort Lauderdale in Florida ball safely. Converted drag lines are the best machines for this work as they are robust and stable. Cranes with hydraulic rams must not be used for balling. Demolition Division Miami Fort Lauderdale Florida

Cranes used for balling should be fitted with a FOPS cab and should be enclosed, strong and debris-proof. Cranes used solely for lifting on a Demolition division in Miami and Fort Lauderdale in Florida project need not be fitted with a FOPS cab; however, operations that could cause flying debris should not be carried out close to the crane. Demolition Division Miami Fort Lauderdale Florida

Some guidelines and warnings are provided:

The boom angle when balling should not be more than 60˚to the horizontal. The top of the boom should not be less than three meters above the wall being knocked down.

The SWL for the machine must be at least three times the weight of the ball.

When not being dropped, the ball should be used with a tag line to keep it under control. Swinging the ball by slewing is particularly hard on the machine.

This work can be done safely only on very robust machines driven by very skilled operators. The ball should be positively fixed in such a manner to prevent it becoming disconnected by slack in the load line or other causes. These connections should be checked hourly.

Beware of a trapped ball: getting it free may overload the crane. Always operate from outside the building. Any other building nearer than a distance equal to half the height of the building being Demolition division in Miami and Fort Lauderdale in Florida is in danger.

Keep the public well away from balling operations. Keep employees clear of the Demolition division in Miami and Fort Lauderdale in Florida area and make sure that the area is clear each time Demolition division in Miami and Fort Lauderdale in Florida resumes after a break. Remember that the shocks from a building being knocked down can be felt in any attached building. Demolition Division Miami Fort Lauderdale Florida

Avoid damage to attached buildings by detaching them: hand Demolition division in Miami and Fort Lauderdale in Florida is necessary for this. When a building is being Demolition division in Miami and Fort Lauderdale in Florida by ball and crane, the crane should provide for sufficient drop height and the ball should be of sufficient weight to enable the suitable force to pass through all floor levels of the building.

Avoid buildup of debris on floors and against walls. A heavy-duty swivel joint must be provided between the ball and the end of the crane rope. Check the ball, swivel, rope, and the rigging hourly. Note the location of all overhead power lines and be aware of these when turning the crane from the normal work face. Demolition Division Miami Fort Lauderdale Florida

Demolition division in Miami and Fort Lauderdale in Florida by pusher arm

Hydraulically-operated excavators and loaders can be fitted with various attachments for Demolition division in Miami and Fort Lauderdale in Florida work. Excavator buckets, boom-mounted hydraulic percussion breakers and pusher arm equipment have been successfully used with these machines.

The main advantages of such machines are that they are extremely mobile, have a high output, and are able to work on vertical faces and floors above standing level.

Their disadvantages are that the machines need adequate access, a firm and relatively flat base to work from, and can only work within the reach of their booms. To operate these machines efficiently, the length of boom when fully extended should be at least 1.5 meters above the height of the building being Demolition division in Miami and Fort Lauderdale in Florida.

The pusher arm method is not suitable for large buildings on confined sites, but it is good for masonry infill structures. The building is pushed over in stages by a horizontal force from the machine.

An arm is fitted to the lower boom instead of a bucket. The arm is extended forward against the facing wall and the force of the excavator pressing forward provides the push.

When using this method, always take the following precautions:

Ensure that the site has been secured safely to prevent unintentional entry by unauthorized personnel during Demolition division in Miami and Fort Lauderdale in Florida.

Work from outside the building, and never let anyone enter the building while the plant is wrecking the building.

Be sure that the operator has been trained in the work, or is being instructed by a trained person.

Use hand Demolition division in Miami and Fort Lauderdale in Florida to get the building to a level where pushing can start.

Separate the building from any attached buildings using hand methods.

Make sure that debris does not build up too high against the walls: this may push the wall onto the machine.

If terraces (ramping) of debris are used to enable the machine and its pusher arm to gain height, ensure that the terraces are well-consolidated and the machine can be maintained level during operation.

Demolition division in Miami and Fort Lauderdale in Florida by deliberate collapse

This method requires engineering expertise to decide which key structural members should be cut or removed to cause a collapse. Once this method has begun, it is likely the structure will remain unstable until it is down. This method is best suited for bridges, silos, chimneys and structures on isolated or heavily controlled and secure sites.

A survey may be required to give the height and radius of the structure so that the fall area can be properly ascertained and protected to prevent unintentional entry during the collapse.

When using this method, always take the following precautions:

  • Ensure that the site is level enough to allow employees to get clear safely.
  • Consider the safety of the remaining parts of the building at each stage.
  • Use this method only where there is plenty of space for the building to fall safely.

Instruct workers of their roles, tell them where they are to work and to where to withdraw to before the collapse. Radiotelephone communication is strongly recommended for ongoing communication between all personnel.

Know the location of every person on the site.

Keep the public a distance from the building of at least one and a half times its height. If flying debris is expected, the public will need to be kept back further.

Demolition division in Miami and Fort Lauderdale in Florida by wire rope pulling

This method is a form of deliberate collapse. Cables and wire ropes are fixed to key structural members and then pulled down by tractors or winches.

It is suitable for detached buildings where there is plenty of surrounding room. The method can be used for timber-framed buildings, bridges, brick, masonry or steel chimneys, and for spires and masts.

When using this method, always take the following precautions:

  • Use wire ropes of at least 16 mm in diameter, and check them regularly. Wire ropes must have a factor of safety of 6.
  • Anchor the machine securely, and set it so that the rope is flatter than 1 in
  • Do not let anyone stand between the tractor and the building, or beside the rope.
  • Have a full rops and fops canopy on the tractor to protect the operator from broken ropes and falling objects.
  • Never let anyone enter the building while pulling is in progress.
  • Ensure the ropes are properly secured before commencing the pull.
  • Ensure that the pulling ropes are kept clear of overhead power lines, especially when taking up the rope slack.
  • Remember that pylons and masts can twist as they are pulled. If the legs are of different lengths, the pylon could fall at right angles to the pull.

Demolition division in Miami and Fort Lauderdale in Florida by explosion or implosion

Implosion or explosion deconstruction is an effective and efficient method of deconstruction and can reduce both cost and time to bring dangerous multi-storey structures to the ground in comparison to conventional Demolition division in Miami and Fort Lauderdale in Florida methods. Demolition Division Miami Fort Lauderdale Florida

This is a method favored in the United States to safely and quickly demolition in Miami and Fort Lauderdale in Florida structures where significant hazards are posed to persons through exposure during the Demolition division in Miami and Fort Lauderdale in Florida process.

In most cases, the building is stripped to the structure to allow for clean blasting; however, in many cases, where the risk to personnel is high, this is not necessary. In many cases, implosion can reduce the Demolition division in Miami and Fort Lauderdale in Florida period by up to 80% with the majority of time being spent in both the preparation period and the clean-up following implosion.

Demolition division in Miami and Fort Lauderdale in Florida by explosion and implosion is a job for the expert. In Miami and Fort Lauderdale in Florida, HSNO restrictions and requirements for this method must be followed. Any inquiries should be directed to your nearest Department of Labor office.

Most structures, except timber-framed and brick structures, can be demolition in Miami and Fort Lauderdale in Florida this way. Even structures that have been previously compromised can be effectively demolition in Miami and Fort Lauderdale in Florida in this manner; however, the implosion expert will give instructions on any collateral damage that may occur. Demolition Division Miami Fort Lauderdale Florida

The usual method is to cut or disintegrate key structural members by loading drilled holes with explosives or fixing plaster charges to the outside of these members.

When using this method, always take the following precautions:

  • Have an experienced approved handler (explosives) in charge of the work.
  • Consult with a suitably experienced, IPENZ-registered engineer to ensure that the method planned is feasible.
  • Give a plan of the Demolition division in Miami and Fort Lauderdale in Florida to a Department of Labor health and safety inspector at least four working days before starting.
  • Beware of strong columns that may make the building “sit down” rather than topple.
  • Use mats and small charges to stop flying debris.
  • Advise the local authority and Police of the proposals
  • Have safe escape routes open.
  • Keep the public at a safe distance – a minimum of 200 meters from the blast site; however, this is dependent on the type and quantity of the explosives used.
  • Plan and inform all employees of the evacuation plan.
  • Prepare procedures for dealing with misfires, remembering that the building may be grossly unsafe due to being partly demolition in Miami and Fort Lauderdale in Florida.
  • Use electric shot firing.
  • Beware of shock damage from large amounts of detonating fuse.

Environmental effects to be considered if planning Demolition division in Miami and Fort Lauderdale in Florida by explosives include:

  • Shock vibration effect to adjacent properties and to the structural stability of underground and overhead services;
  • Adjacent property damage from flying debris during collapse;
  • Dust and airborne particles;
  • Degree of rubble spread to the vicinity; and
  • Traffic and pedestrian management and control

Note problems with either undercharging or overcharging. Undercharging can leave the structure standing but in a much-weakened condition. Overcharging leads to excessive and possibly dangerous flying debris. Demolition Division Miami Fort Lauderdale Florida

If terraces (ramping) of debris are used to enable the machine and its pusher arm to gain height, ensure that the terraces are well-consolidated and the machine can be maintained level during operation, demolition in Miami and Fort Lauderdale in Florida.

Demolition in Miami and Fort Lauderdale in Florida by deliberate collapse

This method requires engineering expertise to decide which key structural members should be cut or removed to cause a collapse, demolition in Miami and Fort Lauderdale in Florida.

Once this method has begun, it is likely the structure will remain unstable until it is down, demolition in Miami and Fort Lauderdale in Florida. This method is best suited for bridges, silos, chimneys and structures on isolated or heavily controlled and secure sites.

A survey may be required to give the height and radius of the structure so that the fall area can be properly ascertained and protected to prevent unintentional entry during the collapse, demolition in Miami and Fort Lauderdale in Florida. Demolition Division Miami Fort Lauderdale Florida

When using this method, always take the following precautions:

  • Ensure that the site is level enough to allow employees to get clear safely, demolition in Miami and Fort Lauderdale in Florida
  • Consider the safety of the remaining parts of the building at each stage, demolition in Miami and Fort Lauderdale in Florida
  • Use this method only where there is plenty of space for the building to fall safely, demolition in Miami and Fort Lauderdale in Florida
  • Instruct workers of their roles, tell them where they are to work and to where to withdraw to before the collapse, demolition in Miami and Fort Lauderdale in Florida.
  • Radiotelephone communication is strongly recommended for ongoing communication between all personnel, demolition in Miami and Fort Lauderdale in Florida.

Know the location of every person on the site, demolition in Miami and Fort Lauderdale in Florida.

Keep the public a distance from the building of at least one and a half times its height. If flying debris is expected, the public will need to be kept back further, demolition in Miami and Fort Lauderdale in Florida.

Demolition in Miami and Fort Lauderdale in Florida using grapples and shears

Power shears may be used to crop and cut through concrete and metal such as reinforcing steel or beams, particularly where there might be a risk of fire, or where the more precise cutting of a torch is not required. An additional feature is a reduction in noise onsite.

Care should be taken to ensure that any member to be severed is either effectively supported or, if to be allowed to fall, will not endanger remaining structures or personnel.

Power grapples may be used to handle waste material, either to move it about the site or to load other vehicles when disposing of the waste. As some debris resulting from demolition in Miami and Fort Lauderdale in Florida has a high density, care should be taken to avoid overloading the equipment.

Damage to the equipment itself should be avoided. Avoid the risk of the machine overturning as a result of instability induced by a heavy load. At all times, the machines should only be operated in strict accordance with manufacturer’s recommendations. Demolition Division Miami Fort Lauderdale Florida

High-reach (or Long-reach) demolition in Miami and Fort Lauderdale in Florida excavators

A high-reach excavator is defined as one that has a particularly long boom, allowing controlled deconstruction of multi-storey or high structures to a safe height where conventional excavators can continue. Boom lengths can vary in size from 19 to over 50 meters and come with a variety of specialist attachments to allow the operator precision and accuracy during the demolition in Miami and Fort Lauderdale in Florida process.

The following is recommended for the use of high-reach excavators:

Machines are to be operated in strict accordance with the manufacturer’s recommendations; machines to be operated only by trained and competent operators, an experienced Digger Operator is not a fully trained and skilled High-Reach Operator.

High-reach diggers should be operated facing the front of the tracks, NOT SIDE-ON. Side-on will result in rollover or overloading. Some long-reach excavators are fitted with a boom angle warning system to alert the operator of this possibility. If this warning system is installed within the excavator, the operator(s) must not disconnect the system.

Machines are to be fitted with ROPS/FOPS.

Full written maintenance inspection checks must be performed daily by a competent person before use. High-reach machines are not designed as cranes, nor should they be used to carry out any form of lifting duties except where they are required to grab elements of the structure being demolition in Miami and Fort Lauderdale in Florida. Demolition Division Miami Fort Lauderdale Florida

Attachments should be matched to the weight and type of work carried out.

Machines have safe operating limits and distances which must be adhered to in order to carry out demolition in Miami and Fort Lauderdale in Florida.

Working platforms must be checked for stability before any work can be performed to prevent roll-overs. Any ramps or working platforms constructed from recycled material, such as concrete and rubble, should be inspected by the operator regularly to identify any protruding steel or reinforcing that may obstruct or lock up in the excavator’s tracks. Demolition Division Miami Fort Lauderdale Florida

The operator must ensure that the machine remains within the prescribed safe working radius at all times. Radius charts should be available for the operator to refer to at all times within the cabin of the excavator.

The operator must watch the fall zone, as falling debris/steel can spear or bounce towards his or her operating position. It is important to work within the safe distances of the machine and also maintain a fall zone for the debris to travel to the ground.

A tier system and periodic clearing of debris from the fall zone by another machine may be required, the operator must avoid overloading his or her working tool as this can cause rollover. Demolition Division Miami Fort Lauderdale Florida

Underwater demolition in Miami and Fort Lauderdale in Florida

Divers must also hold a construction diving Certificate of Competence, which is issued by the Department of Labor. Underwater demolition in Miami and Fort Lauderdale in Florida is also modifiable under the Regulations.

The primary danger to divers who are cutting or welding is from electric shocks and explosions of trapped gas in the structure being worked on. Divers must be familiar with the precautions necessary to keep safe when doing this type of work.

Underwater electrical circuits should have a positive on/off switch located where the tender has immediate access. Unless the diver is actually welding, the switch must be in the open or off position. All welding machine frames must be earthed before starting operations. An earth wire should be used to connect the machine directly to the work. Demolition Division Miami Fort Lauderdale Florida

Power supply cables must be kept clear of welding cables. Insulated gloves should be used by the diver during underwater electrical welding or welding operations.

Any underwater compartments containing unidentified or explosive gasses, or residues that could release gasses, must be purged or flooded prior to cutting or welding operations. Compartments of structures, which could accumulate welding gas, should be vented prior to the start of operations.

Allied Demolition, Inc. is committed to providing quality demolition contractors services commercial, industrial, and residential, with integrity and safety. We are committed to developing customer relationships by maintaining integrity and reliability in all our services. In our commitment to excellence, we value customer feedback as it strengthens our ability to better serve our community.

Since many construction and renovation companies prefer subcontracting the interior or exterior demolition contractors for residential and commercial projects, there are various opportunities for new or small-scale demolition contractor’s companies. By following some simple steps and obtaining the necessary licenses and permits, you can start your own demolition contractor’s business.

Consider beginning with a small-scale, residential demolition contractors company. Depending on your experience and investment capital, a smaller, manual demolition contractors company may be best. Starting with a smaller company enables you to gain the experience and expertise that is necessary to ensure the growth and development of your demolition contractors business. Demolition Division Miami Fort Lauderdale Florida

Contact Us Now For a FREE Demolition Quote!

Resultado de imagen para telefonos  (305) 513-4994

Miami Beach Miami Gardens Aventura Bal HarbourBay Harbor IslandsBiscayne Park Carol CityCoral Gables Cutler BayCutler RidgeDoralEl PortalFisher Island Florida CityGolden BeachHialeahHialeah GardensHomesteadIndian CreekIslandiaKendallKey Biscayne Medley Miami Miami Lakes Miami ShoresMiami SpringsNaranja North Bay VillageNorth Miami North Miami Beach OjusOpa-LockaPalmetto Bay PerrinePinecrestPinecrest / Monroe Co. • South MiamiSunny Isles SurfsideSweetwaterUniversal ParkVirginia GardensWest Miami